Evacuation Plan

Bristol-Myers Squibb – Warehouse Phase 2 Drain

38 Jackson Rd.  Devens, MA

Job # 2814

An evacuation will be ordered for life threatening emergencies (collapse, explosion, fire).  Person/persons discovering emergency shall take the following actions:

  • Immediately dial BMS Security at   x3333 or (978)784-6300
  • Contact Consigli Project Manager: Ryan Stock (508)458-0517
  • Consigli Superintendent: Samir Chenaif (774)278-8266

    Evacuation order shall be:
      
  • Alerting all workers by the sounding of three long blasts of an air horn or sounding the building alarm
  • Workers must stop and secure all work and machinery, including all hoisted materials, and evacuate the building immediately by use of the nearest exit.
  • Critical operations shutdown procedures (unless listed above) are not required, because no employees are authorized to delay evacuation for this purpose.
  • Portable fire extinguishers are provided if fire is in incipient/budding phase only.
  • Consigli Supervisor Samir Chenaif and any other trained individual on site, is responsible for performing first aid on any injured person once outside evacuated area. 
  • After an emergency evacuation, employees are directed to gather at the Muster Point located to the right of the main entrance to the warehouse (See below)  – Or the closest BMS Muster Area.
  • Consigli Supervisor Samir Chenaif, or a CCC designee, will be responsible for accounting for all CCC employees on site.
  • Consigli Supervisor Samir Chenaif, or the CCC designee, will be responsible for knowing what subcontractors are on site at all times.
  • A representative from each subcontractor will be responsible for accounting for their employees and notifying Samir Chenaif or the CCC representative. For further assistance with emergency evacuation procedures, you may contact Safety Director Bryan Kingsbury at (508)808-9359.

Muster Point

Back End of Evacuation Plan and Muster Point