Evacuation Plan

92 Seattle Street Renovation Project #2898

92 Seattle Street, Allston MA 02134

An evacuation will be ordered for life threatening emergencies (collapse, explosion, fire).  Person/persons discovering emergency shall take the following actions:

  • Immediately dial Harvard Operations Center (617)495-5560
  • Contact Consigli Superintendent: Duncan Schuster (508)983-4129

Evacuation order shall be:

  • Alerting all workers by the sounding of three long blasts of an air horn. 
  • Workers must stop and secure all work and machinery, including all hoisted materials, and evacuate the building immediately by use of the nearest exit.
  • Critical operations shutdown procedures (unless listed above) are not required, because no employees are authorized to delay evacuation for this purpose.
  • Portable fire extinguishers are provided if fire is in incipient/budding phase only.
  • Superintendent, Duncan Schuster and any other trained individual on site, is responsible for performing first aid on any injured person once outside evacuated area.

After an emergency evacuation, employees are directed to gather next to the emergency call box located to the left of the building main entrance. (See below)  

  • Superintendent Duncan Schuster, or a CCC designee, will be responsible for accounting for all CCC employees on site.
  • Superintendent Schuster, or the CCC designee, will be responsible for knowing what subcontractors are on site at all times. A representative from each subcontractor will be responsible for accounting for their employees and notifying Duncan Schuster or the CCC representative. For further assistance with emergency evacuation procedures, you may contact Safety Director Bryan Kingsbury (508)808-9359.

Muster Point

Back End of Evacuation Plan and Muster Point